Shed Slabs Townsville – Strong Foundations for Storage

When Townsville's Ground Conditions Test Every Foundation

Professional concrete shed slab for double garage, freshly poured and smoothly finished,

Anyone who’s tried putting up a shed in Townsville knows the ground here doesn’t mess around. You’ve got reactive clay that shifts in the wet season, cyclone winds that’ll test every anchor point, and humidity that seems determined to work its way under anything that’s not properly sealed.

We’ve been pouring shed slabs across Townsville for years now, from residential garages in the suburbs to large rural machinery sheds out past the Ring Road. Every job starts the same way – proper site preparation, correctly specified concrete for the intended use, and construction methods that account for our unique North Queensland conditions. Because a shed slab that’s built right the first time means you won’t be dealing with problems down the track when you should be enjoying the space you’ve created.

GET YOUR INSTANT FREE QUOTE NOW

    Newcastle Solar Power Google Reviews and Trust Badge

    Types of Shed Slabs We Pour in Townsville

    Domestic Garage Slabs

    Most residential garage slabs we do are either single (3m x 6m) or double (6m x 6m) configurations. These need to handle your vehicles, plus whatever else ends up stored in there – tools, lawn equipment, maybe a workbench along one wall. The concrete needs to be thick enough and properly reinforced to take the weight without cracking over time.

    Garden Shed Bases

    Smaller shed bases for garden storage or tool sheds don’t need the same thickness as a garage, but they still need proper preparation. Even a small shed sitting on uneven ground or poor drainage will give you problems. We make sure these bases are level, have adequate fall for water run-off, and include a termite barrier.

    Farm and Rural Shed Slabs

    Out on rural properties, shed slabs often need to handle serious loads – tractors, header equipment, heavy machinery. These get specified differently, with increased thickness (often 150mm or more) and heavier reinforcement. Access for concrete trucks can be trickier on rural blocks, which is something we factor into the planning.

    Workshop Foundations

    A proper workshop slab needs to be dead level for machinery setup, strong enough for heavy equipment, and usually includes anchor points for bolting down bench setups or larger tools. Many tradies want their workshop floor to last as long as their business, so we build these to commercial standards even when they’re residential installs.

    Carport Slabs

    Carport slabs are exposed to the weather more than enclosed garages, so drainage becomes even more important. We make sure the fall is correct and that water doesn’t pool anywhere. In Townsville’s wet season, that matters more than people think.

    Storage Unit and Machinery Shed Bases

    Whether it’s a storage unit or a machinery shed, these slabs need to keep stored items dry and provide a stable surface. For machinery storage, we account for point loads where heavy equipment sits, and make sure the edges are properly thickened to support the shed structure.

    Site Preparation and Construction Process

    Site Leveling and Clearing: The site is cleared of vegetation and topsoil, then roughly leveled. Sloped areas may require cut-and-fill to create a stable pad.
    Excavation and Boxing Out: We excavate 150–200mm below finished slab height to allow for base material and slab thickness, with deeper edges where footings are needed.
    Compacted Base Material: A compacted layer of roadbase or crusher dust forms a stable foundation. Proper compaction prevents future settlement and cracking.

    Formwork Setup: Formwork is set to height and level, defining slab shape, fall, and alignment with shed dimensions. It must remain rigid during the pour.
    Reinforcement Mesh Placement: Steel mesh is placed on chairs so it sits at the correct height, overlapping and tied together before the concrete arrives.
    Concrete Pour and Screed Finish: Concrete is poured, leveled, and finished for a smooth, durable surface while ensuring proper compaction and fall.
    Control Joints for Crack Prevention: Joints are added while concrete is workable, allowing controlled cracking as the slab cures.
    Curing Time Requirements: The slab requires at least 7 days of curing before shed installation. Wet curing may be needed in hot weather to prevent cracking.

    Why Concrete Slabs Work Best for Sheds

    A Level, Stable Base That Doesn’t Move

    Trying to build any shed on unlevel ground is asking for trouble. Doors won’t close properly, roofing gets stressed, and the whole structure can rack out of square. A properly poured concrete slab gives you a level platform that stays level, which means your shed goes up right and stays that way.

    Moisture and Flooding Protection

    Raising your shed floor up on concrete keeps everything inside dry. In Townsville’s wet season, ground moisture and surface water can be serious problems. A concrete slab with proper fall and damp-proofing creates a barrier that protects stored items, equipment, and the shed structure itself from water damage.

    Termite-Proof Foundation

    Termites are a real concern in North Queensland. A concrete slab with proper termite barriers gives you protection that timber bearers or dirt floors can’t match. It’s one less thing to worry about when you’ve got valuable equipment or materials stored in your shed.

    Handles Heavy Loads Without Settlement

    Whether it’s vehicles, machinery, or stacked materials, a properly reinforced concrete slab distributes weight evenly and won’t settle or sink over time. This matters more as years go by and you’re still using the space without any floor problems.

    Easy to Clean and Maintain

    Concrete floors in sheds are simple to sweep, hose down, or pressure clean. They don’t rot, don’t need repainting, and don’t harbour pests. For workshops and garages where you’re dealing with oils, grease, or other spills, concrete handles it without damage.

    Adds Property Value

    A quality shed on a proper concrete slab is a selling point when it comes time to move. Buyers recognize the difference between a shed that’s been done properly and one that’s been thrown together. It’s an investment that pays back.

    Slab Specifications That Matter

    Standard Thickness for Different Uses: Light-duty slabs need around 100mm thickness, garages often require 100–125mm, and heavier machinery slabs may need 150mm or more.

    Steel Mesh Reinforcement: All slabs include steel mesh placed correctly to control cracking and strengthen the concrete.

    Thickened Edges for Shed Footings: Edges are thickened to support the shed structure and prevent breakage, tailored to the shed’s size and design.

    Proper Fall for Drainage: A minimum 1:100 fall is used to ensure water drains properly without pooling.

    Anchor Points for Shed Bolting: Anchor points are installed during the pour for cyclone-rated sheds, providing stronger and safer structural fixing.

    Pre-Planning Tips Before You Start

    • Check Council Permit Requirements: Confirm with Townsville City Council whether your shed needs approval to avoid delays.
    • Consider Future Use and Load Requirements: Build a slab strong enough for future needs—upgrading later costs far more.
    • Plan Drainage and Run-Off: Ensure water drains away from the shed and nearby structures to prevent pooling and erosion.
    • Allow for Service Connections: Plan power or water connections early so conduits can be placed before the slab is poured.
    • Measure Shed Kit Dimensions Accurately: Match slab dimensions to the exact shed specifications to avoid installation issues.
    • Consider Door Swing Clearances: Account for roller, sliding, and PA door clearances when sizing and positioning the slab.

    Common Applications We See

    Home Garages and Workshops

    Residential garages are probably half the shed slabs we do. Single or double, attached or detached, these become valuable space for vehicles, storage, and often a workspace. Getting the slab right means the garage functions properly for decades.

    Rural Property Machinery Storage

    Farm properties need somewhere to keep tractors, harvesters, implements, and vehicles out of the weather. These slabs handle heavy loads and often cover large areas. They’re working infrastructure, not just storage.

    Hobby and DIY Spaces

    A lot of people build workshop sheds for hobbies – woodworking, metalwork, car restoration, whatever the interest is. These spaces need a level floor for tool setups and machinery, plus enough size to actually work comfortably.

    Tradie Equipment Storage

    Tradies need secure storage for tools, materials, and equipment. A proper shed on a concrete slab gives you dry, organized space that protects your gear and your livelihood. Many tradies run their business out of a well-set-up shed.

    Boat and Caravan Storage

    High-clearance sheds for boats and caravans need slabs that can handle the point loads from wheels and stabilizers, plus provide level access for towing in and out. These often include wash-down areas with additional drainage.

    Garden Tool Sheds

    Even small garden sheds benefit from a proper concrete base. Keeps mowers, tools, and stored items dry, provides level access, and prevents the shed from shifting or settling over time.

    Ready to Replace Shed slabs?

    If you’re working with a shed supplier, we can coordinate with them to make sure the slab meets their installation requirements. Getting everyone on the same page before work starts prevents problems during shed construction.

    Ready to get your shed slab project underway? Contact us for a free site visit and quote. We’ll make sure your shed starts with a foundation that’s built to last in Townsville’s conditions.

    FAQs About Shed Slabs in Townsville

    How much does a shed slab cost in Townsville?

    A standard single garage slab (3m x 6m) typically runs between $2,500-$3,500, while a double garage (6m x 6m) sits around $4,500-$6,500 depending on site conditions and thickness requirements. Sloped blocks, difficult access, or reactive clay that needs extra base prep will push costs up. Best thing is to get a free site visit so we can give you accurate pricing based on what your property actually needs rather than ballpark figures.

    Do I need council approval for a shed slab in Townsville?

    It depends on the size and location of your shed. Sheds under 10 square metres usually don’t need approval, but anything larger, closer to boundaries, or over a certain height will trigger council requirements. Townsville City Council’s planning scheme has specific rules about setbacks and building sizes. I always recommend checking with council before you order your shed kit – saves headaches later.

    How long after pouring can I start building the shed?

    You need minimum 7 days before bolting down a shed frame or putting serious loads on the slab. In Townsville’s heat, concrete reaches working strength fairly quickly, but rushing it causes problems with anchor holding power and surface durability. During wet season when humidity is high, we sometimes recommend waiting a bit longer. Patience here pays off with a slab that performs properly for the life of your shed.

    What happens if it rains while you're pouring the slab?

    We watch the weather closely and won’t start a pour if heavy rain is forecast. Light rain after the concrete has been finished and started setting isn’t usually a problem – we’ll cover it if needed. Heavy rain on fresh concrete can damage the surface and weaken the mix, so if conditions turn bad mid-pour we have to make calls about whether to continue or reschedule. Townsville’s afternoon storms in summer mean we often start early to beat the weather.

    Can you pour concrete slabs in Townsville's summer heat?

    Yes, but it takes extra care. Summer heat makes concrete set faster, which means we need to work quickly and cure it properly to prevent surface cracking. We often schedule summer pours for early morning, use additives to slow the set time, and wet cure the slab for several days after pouring. Hot weather concreting is normal here – we just adjust our methods to handle it.

    What's the best time of year for shed slab construction in Townsville?

    Honestly, we pour slabs year-round in Townsville. Dry season (May to October) is easier because you don’t have afternoon storms to worry about, but we can work through wet season too with proper planning. The bigger issue is usually your own timeline – if you need the shed now, we can make it work regardless of season. Just might need rain contingencies during the wetter months.